loader image

KWSC

Karachi: A major wastewater treatment and recycling scheme known as TP-IV is being developed to intercept sewage flowing through the Malir basin, treat it and....

Karachi: A 35 million gallons per day (MGD) secondary sewage treatment facility at TP-1 Haroonabad has been made operational and has been running on a....

Karachi: According to the supplied report, the Karachi Water and Sewerage Corporation (KW&SC) and Frontier Works Organization (FWO) have signed an agreement to construct a....

Karachi: The Karachi Water and Sewerage Corporation (KW&SC) and Frontier Works Organization (FWO) have signed an agreement for the Dumlottee dedicated water pipeline, a major....

Karachi: Mayor Karachi Murtaza Wahab has announced that Pakistan’s first Industrial Water Park is being developed at the TP-1 sewage treatment plant near Karachi’s SITE....

The Karachi Water and Sewerage Corporation has launched a pilot project to install protective safety nets inside manhole covers as a preventive measure against accidents.....

Karachi: The Karachi Water and Sewerage Corporation (KWSC) has initiated a special emergency plan to ensure uninterrupted water supply and drainage services during Muharram-ul-Haram and....

Karachi’s water crisis deepened on Friday as repeated power failures by K-Electric disrupted water pumping operations across the city. According to the Karachi Water and....