loader image

As Groundwater Keeps Falling Lahore Moves Ahead with Rs31.6bn Canal Water Plan

Lahore: Punjab is moving ahead with a Rs31.592 billion surface-water project designed to reduce Lahore’s heavy dependence on groundwater. Under the plan, a treatment plant near Bhaini Road will draw water from the BRBD Canal and initially treat 54 million gallons per day (MGD) for drinking-water supply.

The project includes raw-water pipelines, pumping stations, sedimentation and filtration facilities, treated-water storage, chlorination, drainage infrastructure, a transmission main and related distribution works. The CDWP has cleared the revised PC-I and referred it to ECNEC for final consideration. WASA officials say physical execution will begin after that final approval.

The project is intended to gradually reduce pressure on Lahore’s aquifer, while shifting part of the city’s water supply toward treated surface water.

Leave a Reply

Your email address will not be published. Required fields are marked *

Related News

Dubai: Dubai’s Roads and Transport Authority (RTA) has announced the return of four dedicated bus routes connecting major transport stations with Global Village as the

....

Islamabad: The first phase of the long-delayed Islamabad Model Jail in Sector H-16 has been completed and is ready for inauguration, according to the Capital

....

Peshawar: Normal life is gradually returning to Peshawar after two days of tight security and road closures. Major roads have reopened, public transport and BRT

....