Islamabad: The estimated cost of the Tarbela 5th Extension Hydropower Project has risen from roughly Rs82 billion to about Rs316 billion, an increase of around Rs234 billion, after ECNEC considered
Diamer: The Diamer Basha Dam Project has achieved a major construction step with the successful pulling of the main cable for a 30-ton cable crane across the River Indus. According
South Waziristan: The Water and Power Development Authority (WAPDA) has successfully restored the damaged generating unit at the Gomal Zam Hydel Power Station, bringing the plant back to its full