Completed

Kings Town Phase 1 is a master-planned residential housing project developed by Al-Kabir Developers, planned to offer organized and affordable housing options near Lahore’s Raiwind Road corridor. The project is

Al Kabir Town Phase 1 is a master-planned residential housing project developed by Al-Kabir Developers, designed to provide organized and affordable housing solutions on Lahore’s expanding urban periphery. The project

Sui Southern Gas Company Limited 42 Inch RLNG 80 km Pipeline Project is a strategic gas transmission infrastructure initiative developed to transport Re Gasified Liquefied Natural Gas from LNG import

The Golen Gol Hydropower Project is a renewable energy development located on the Golen Gol River, a major tributary of the Mastuj River in District Chitral, Khyber Pakhtunkhwa. The project

The Lower Indus Right Bank Irrigation and Drainage Project RBOD-I is a major water management and environmental improvement initiative implemented in Sindh Province. The project is located in the districts

The Chashma Right Bank Canal Project is a major irrigation development designed to support agricultural production across Khyber Pakhtunkhwa and Punjab. The canal off takes from the right bank of

The Balochistan Effluent Disposal into RBOD (RBOD III) Project is a major drainage and environmental management initiative designed to provide effective effluent disposal facilities for existing and proposed drainage systems

The Nai Gaj Dam Project is a water storage and hydropower development located on the Gaj River in the gorge area at the edge of the Kirthar Range, approximately sixty

Tarbela Dam is one of the world’s largest earth and rock filled dams and Pakistan’s most significant water resource development project. Completed in 1976 as part of the Indus Basin

Mangla Dam is a major multipurpose water resource and hydropower project constructed on the River Jhelum near Mangla, located about 30 kilometers upstream of Jhelum city and approximately 120 kilometers