Sindh Master Plan Department

Contact Information

Key Functions

  • Urban planning formulation
  • Land use regulation
  • Zoning policy development
  • Infrastructure design guidance
  • Regional growth management
  • Housing scheme evaluation
  • Environmental impact assessment
  • Sustainable city planning.

Master Plan Department was established in 1968 under Karachi Development Authority (KDA) with the technical assistance of United Nations, during the preparation of Karachi Development Plan (1974-85). It was renamed as Master Plan & Environmental Control Department in late 1970s.Later on, analyzing the needs of the metropolitan city of Karachi and to enhance the capacity of Master Plan Department, the Governing Body of Karachi Development Authority (KDA) in its 2nd meeting of 2000 held on 18-04-2000 at 2:30 P.M in the conference room of Civic Centre, KDA, under the Chairmanship of Chief Secretary Sindh, resolved that A Consultant (Urban Planner) would be appointed for the capacity building of Master Plan Department, and a board for control of Master Plan Department would be established with representation of all the development agencies of Karachi for which a summary will be moved by Housing and Town Planning Department.Meanwhile, Sindh Local Government Ordinance-2001 was promulgated, and a devolution plan was introduced, as a result KDA was dissolved. Subsequently, three departments of KDA – i.e. Master Plan & Environment Control (MP&EC), Design Bureau (DB) and Planning & Urban Design (P&UD) – were merged into one department and renamed as Master Plan Group of Offices (MPGO). Consequently, the MPGO was placed under the umbrella of City District Government Karachi (CDGK).In the year 2011, the MPGO was placed under the control of Karachi Metropolitan Corporation (KMC) and renamed as Master Plan Department (MPD).

Contact Information

E-Library

All

No documents found.

Projects

Real Estate Functions

  • Urban planning formulation
  • Land use regulation
  • Zoning policy development
  • Infrastructure design guidance
  • Regional growth management
  • Housing scheme evaluation
  • Environmental impact assessment
  • Sustainable city planning.

Sui Southern Gas Company Limited 42 Inch RLNG 80 km Pipeline Project is a strategic gas transmission infrastructure initiative developed to transport Re Gasified Liquefied Natural Gas from LNG import

Sui Northern Gas Pipelines Limited LPG Cylinder Supply Project is an energy supply initiative approved to address low gas pressure and supply shortages faced by tail end domestic consumers during

The Diamer Basha Dam Project is a large-scale hydropower and water storage development being constructed on the Indus River near Chilas, located between Khyber Pakhtunkhwa and Gilgit Baltistan. The project

The Dasu Dam Hydropower Project is a major renewable energy initiative planned on the Indus River and designed to be developed in two stages. The total planned installed capacity of

The Mohmand Dam Hydropower Project is a major water storage and renewable energy initiative designed to support electricity generation, irrigation development and flood mitigation. Construction work is progressing at a

The Tarbela 5th Extension Project is a major hydropower development undertaken at Tarbela Dam, located on the Indus River in District Swabi, Khyber Pakhtunkhwa. The project was developed to enhance