Excise, Taxation & Narcotics Control Department

Contact Information

Key Functions

  • Tax collection
  • Vehicle registration
  • Property evaluation
  • Narcotics control
  • Excise duty enforcement.

The Excise, Taxation & Narcotics Control Department (ET&NCD) Lahore functions under the Government of Punjab. It is the main provincial revenue-collecting department, alongside playing a significant role in motor vehicle management and narcotics control. Its head office is located at Transport House, 11-Egerton Road, Lahore.The Excise, Taxation and Narcotics Control Department provides services for collection of various taxes and duties efficiently and effectively and suggests ways and means for additional resource mobilization in the Province. Apart from building up of taxpayer’s confidence, creation of taxpaying culture and providing facilities to the general public in payment of taxes are the top most priorities.

Contact Information

E-Library

All

No documents found.

Projects

Real Estate Functions

  • Tax collection
  • Vehicle registration
  • Property evaluation
  • Narcotics control
  • Excise duty enforcement.

Sui Southern Gas Company Limited 42 Inch RLNG 80 km Pipeline Project is a strategic gas transmission infrastructure initiative developed to transport Re Gasified Liquefied Natural Gas from LNG import

Sui Northern Gas Pipelines Limited LPG Cylinder Supply Project is an energy supply initiative approved to address low gas pressure and supply shortages faced by tail end domestic consumers during

The Diamer Basha Dam Project is a large-scale hydropower and water storage development being constructed on the Indus River near Chilas, located between Khyber Pakhtunkhwa and Gilgit Baltistan. The project

The Dasu Dam Hydropower Project is a major renewable energy initiative planned on the Indus River and designed to be developed in two stages. The total planned installed capacity of

The Mohmand Dam Hydropower Project is a major water storage and renewable energy initiative designed to support electricity generation, irrigation development and flood mitigation. Construction work is progressing at a

The Tarbela 5th Extension Project is a major hydropower development undertaken at Tarbela Dam, located on the Indus River in District Swabi, Khyber Pakhtunkhwa. The project was developed to enhance